Rated output for one model
Use the model’s own rated-output row, plus the running and starting load list.
Product line · buyer page
Compare open-frame diesel models and series by rated output, engine, phase and the equipment included in the order.
Category directory
Models in this category
Open a model; final configuration is confirmed in the quotation.





Video review
A vertical walkthrough shows rows of red-and-black open-frame generator-like units in a workshop environment.
The footage supports only the visible open-frame layout and workshop setting. Placement on this category page does not establish diesel fuel, BEAR ownership or manufacture, an exact model, output, electrical configuration, certification, production capacity, inventory or public-use rights.
Open the dedicated video page →Choose and verify
Use the model’s own rated-output row, plus the running and starting load list.
Specify the electrical version before comparing panel, outlet and current information.
List wheel kits, starting equipment and ATS separately so inclusion is clear in the offer.
| Decision field | Compare | Confirm before order |
|---|---|---|
| Duty and output | Running load, starting demand and operating pattern | Rated data for the exact model |
| Phase and panel | Single- or three-phase requirement, voltage, frequency and controls | Selected production configuration |
| Starting | Manual, electric or other offered method | Standard equipment and battery inclusion |
| Mobility | Feet, wheel kit, handles and lifting approach | Included versus optional hardware |
| Documents | Nameplate, datasheet, photos of the offered unit and test or document pack | One consistent set of documents for the model before order |
Visual range review
Compare visible construction and service access. Exact specifications follow the linked model record.
No. The 1100F / 1103F machines and the 2V88 / 2V92 / 2V95 machines are separate ranges even when a catalogue table sits them on one spread. Compare engine family, rated output and the exact model page.
Select phase from the connected equipment and destination electrical system before the quote is finalized. Do not infer it from the model suffix without exact documentation.
Check the model and nameplate, control panel, starting, outlets or terminals, frame and guards, wheel kit, visible assembly, operating behavior, manual and packing against the approved specification.
Inside BEAR
A quick view of the product range, assembly work and prepared packaging.


